EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Southport Connector
Project Development and Environment (PD&E) Study

Home / Documents & Publications

Documents & Publications


The FDOT is currently wrapping up the Alternative Corridor Evaluation (ACE) process. The ACE process is conducted to evaluate corridors and recommend those that should move forward for additional analysis as part of the National Environmental Policy Act (NEPA). A Methodology Memorandum (MM) was developed as part of the ACE process.  The MM outlined the analysis methodology that would be used to refine and eliminate corridor alternatives. The project team met with various federal, state and local agencies to review the document and obtain comments. Following Federal Highway Administration (FHWA) approval of the MM, an Alternative Corridor Evaluation Report (ACER) was prepared, which recommends that three alternative corridors be considered for further evaluation. The ACER is currently being reviewed by the environmental agencies and FHWA through the Efficient Transportation Decision Making (ETDM) Environmental Screening Tool (EST) as ETDM number 13961.

Final Approved Alternative Corridor Evaluation Report (Uploaded April 6, 2016)

Alternative Corridor Evaluation Report, October 13, 2015

Agency Project Advisory Group Meeting November 17, 2015

Corridor Public Workshops January 13, 2015 and January 15, 2015

Corridors 1 through 10 - Advantages and Disadvantages (PDF Files):

Alternatives Display Boards (PDF Files):

Evaluation Screening Criteria (PDF Files):

Corridor Public Workshops Presentation:

Project Advisory Group Meeting December 11, 2014

Public Kick-off Meetings September 10, 2013 and September 13, 2013

Agency Project Advisory Group Meeting August 27, 2013

 


 

To submit a comment about the study, click here.